Close Menu
    Facebook X (Twitter)
    Tuesday, October 14
    BiznasBiznas
    Facebook X (Twitter)
    • Home
    • About Us
    • Startups
    • Finance
    • Property
    • Marketing
    • Interviews
    • Others
      • Events and Networking
      • Technology
      • Digital Marketing
      • Business
      • Management
    Subscribe
    BiznasBiznas
    Home » Business » VitrA Tiles Reinforces Sustainability Goals with Aksaray Solar Power Plant
    Business

    VitrA Tiles Reinforces Sustainability Goals with Aksaray Solar Power Plant

    Danielle TriggBy Danielle TriggMarch 12, 2025Updated:March 12, 2025No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    VitrA Tiles has officially launched its Aksaray solar power plant, marking a major step in its commitment to green energy.

    As a leading company in the Eczacıbaşı Group, VitrA Tiles is making significant strides in sustainable energy adoption. The completion of the Aksaray Solar Power Plant (SPP) follows the 3.5 MW rooftop solar power plant commissioned in Bozüyük in 2023. With a 30 MWe/36 MWp capacity, this latest investment will ensure that more than 50% of the electricity used in its Turkish operations this year comes from renewable energy sources.

    Contributing to a Cleaner Future

    The Aksaray SPP is designed to produce enough electricity to power approximately 19,700 households annually. Equipped with 65,520 PV modules, each with a 550 Wp capacity, the plant is expected to cut carbon emissions by 37,190 tonnes per year.

    VitrA Tiles CEO Mert Karasu reiterated the company’s commitment to sustainability, stating: “We aim to produce half of our electricity consumption from our own renewable energy facilities by 2025 and all of it by 2030 and thanks to this investment, we are one step closer to our global goals by further reducing our carbon footprint. We are committed to meeting all our electricity needs from renewable sources in the future.”

    The construction of the Aksaray SPP began in April 2024, with electricity generation commencing in February 2025 after the successful completion of PV module installations, inverters, transformers, cabling, and power transmission lines. This initiative not only brings economic and environmental advantages but also plays a key role in shaping the industry’s renewable energy transition.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Danielle Trigg
    Danielle Trigg

    Related Posts

    MODULE-T Expands in Europe with New Operations in France and Germany

    October 14, 2025

    ICFE 2026 Marks Record Expansion as Istanbul Welcomes the World

    October 13, 2025

    MetaTerra Commences Talks on Miracle Pay Integration at Romania’s New Airport Project

    October 9, 2025

    Comments are closed.

    Latest Posts

    MODULE-T Expands in Europe with New Operations in France and Germany

    October 14, 2025

    ICFE 2026 Marks Record Expansion as Istanbul Welcomes the World

    October 13, 2025

    International Sanctions Enforcement Crisis: UK Courts Abandon Judicial Oversight

    October 10, 2025

    MetaTerra Commences Talks on Miracle Pay Integration at Romania’s New Airport Project

    October 9, 2025
    Biznas
    Facebook X (Twitter)
    • About Us
    • Get In Touch
    • Privacy Policy
    • Meet the Biznas Team
    • Terms and conditions
    © 2025 ThemeSphere. Designed by Biznas.

    Type above and press Enter to search. Press Esc to cancel.